Bathroom RemodelingReady to Hire

Bathroom Remodeling

Posted September 14, 2017

Project Description

We have a bathroom that needs to be updated. Here is what we want done.... 1. Remove the existing bathtub and tile. and install this prefab shower kit... source: http://www.homedepot.com/p/American-Standard-Ovation-33-5-in-x-60-in-x-75-25-in-Combo-5-Piece-Shower-Kit-in-Arctic-BDW002L-OV-011-295/206268601 We would keep all the plumbing where is currently is (left side) 2. Remove the existing vanity and install this vanity... source: https://ari-bath.com/collections/72-bathroom-vanity/products/danny-72-bathroom-vanity-maple-grey 3. Remove linoleum and install floor tile. We would procure the shower kit, floor tile and vanity. We would paint. I can provide pictures of existing bath and vanity. thanks

Project Details

Start Date
2-Weeks
Location
Danville, California 94506
Address
199 Arends Dr
Property Owned
No
Currently in Renovation
No

Homeowner

D

David Schwantes

Member since April 30, 2017

Contact Homeowner
Back to all projects