Bathroom RemodelingReady to Hire
Bathroom Remodeling
Posted May 8, 2019
Project Description
12 shower room ceramic tiles have fallen. They need to be replaced with backsplash. A few other tiles maybe loose needing to be reinstalled. Also a few tiles in the kitchen need to be replaced. I have the tiles and backsplash.
Project Details
- Budget
- up to $500
- Timeline
- Timing is Flexible
- Start Date
- Now
- Location
- Oak Park, California 91377
- Address
- 6148 Barons way
- Property Owned
- Yes
- Currently in Renovation
- No