Bathroom RemodelingPlanning and Budgeting

Bathroom Remodeling

Posted March 11, 2023

Project Description

Remodeling upstairs bathroom. We want to demo the existing fiberglass standing shower and replace with a new tiled walk-in shower. We want to replace the linoleum flooring with new tile flooring and swap the single vanity for a new double vanity. Shower/vanity/toilet will all stay in their existing locations but we are looking to upgrade some of the piping (single to double shower head/faucets) and replace the design elements. I will purchase vanity/tile/design elements on my own and have everything ready on site prior to job start. We are looking for pricing estimates for labor alone.

Project Details

Budget
$5000 to $10000
Timeline
Less than 2 months
Start Date
3-Weeks
Location
Brighton, Michigan 48116
Address
6600 academy drive
Property Owned
No
Currently in Renovation
No

Homeowner

A

Allison Falconer

Member since March 11, 2023

Contact Homeowner
Back to all projects