Bathroom RemodelingPlanning and Budgeting
Bathroom Remodeling
Posted March 11, 2023
Project Description
Remodeling upstairs bathroom. We want to demo the existing fiberglass standing shower and replace with a new tiled walk-in shower. We want to replace the linoleum flooring with new tile flooring and swap the single vanity for a new double vanity. Shower/vanity/toilet will all stay in their existing locations but we are looking to upgrade some of the piping (single to double shower head/faucets) and replace the design elements. I will purchase vanity/tile/design elements on my own and have everything ready on site prior to job start. We are looking for pricing estimates for labor alone.
Project Details
- Budget
- $5000 to $10000
- Timeline
- Less than 2 months
- Start Date
- 3-Weeks
- Location
- Brighton, Michigan 48116
- Address
- 6600 academy drive
- Property Owned
- No
- Currently in Renovation
- No