Bathroom RemodelingReady to Hire
Bathroom Remodeling
Posted October 22, 2014
Project Description
The bathroom was previously gutted out. Since then the walls have all been restored except one. It needs to be put back up from brick. There is no sink or tub currently installed. We have a vast majority of the materials such as tile, backer board, sink, plumbing supplies and many more. All that is really need now is the labor.
Project Details
- Budget
- $2500 to $5000
- Timeline
- Less than 2 months
- Start Date
- 2-Weeks
- Location
- St. Louis, Missouri 63115
- Address
- 4560 Athlone ave
- Property Owned
- No
- Currently in Renovation
- No