Bathroom RemodelingReady to Hire
Bathroom Remodeling
Posted September 27, 2015
Project Description
In the half-bath, demolish current sink vanity and medicine cabinet, take off mirror and towel rack. Patch wall where medicine cabinet was. Put up wall paper on the walls, repaint ceiling. Pick up bathroom tile and put down new flooring (“Allure” Trafficmaster resilient grip-strip plank: http://www.homedepot.com/p/TrafficMASTER-Allure-6-in-x-36-in-Cherry-Resilient-Vinyl-Plank-Flooring-24-sq-ft-case-12012/100593151). Install new vanity: http://www.amazon.com/Fairmont-Designs-148-V23-Contour-Collection/dp/B005UU2EVS. All materials will be provided by us. The bathroom is 58” x 59” size, with an appr. 8 foot ceiling.
Project Details
- Budget
- $1000 to $2500
- Timeline
- Less than 2 months
- Start Date
- 1-Week
- Location
- Culver City, California 90230
- Address
- 8211 Summertime Lane Culver City, CA 90230
- Property Owned
- No
- Currently in Renovation
- Yes