Bathroom RemodelingReady to Hire

Bathroom Remodeling

Posted September 27, 2015

Project Description

In the half-bath, demolish current sink vanity and medicine cabinet, take off mirror and towel rack. Patch wall where medicine cabinet was. Put up wall paper on the walls, repaint ceiling. Pick up bathroom tile and put down new flooring (“Allure” Trafficmaster resilient grip-strip plank: http://www.homedepot.com/p/TrafficMASTER-Allure-6-in-x-36-in-Cherry-Resilient-Vinyl-Plank-Flooring-24-sq-ft-case-12012/100593151). Install new vanity: http://www.amazon.com/Fairmont-Designs-148-V23-Contour-Collection/dp/B005UU2EVS. All materials will be provided by us. The bathroom is 58” x 59” size, with an appr. 8 foot ceiling.

Project Details

Budget
$1000 to $2500
Timeline
Less than 2 months
Start Date
1-Week
Location
Culver City, California 90230
Address
8211 Summertime Lane Culver City, CA 90230
Property Owned
No
Currently in Renovation
Yes

Homeowner

E

Edina Kishonthy

Member since September 27, 2015

Contact Homeowner
Back to all projects