Bathroom RemodelingPlanning and Budgeting

Bathroom Remodeling

Posted May 11, 2016

Project Description

I have approximately 20 apartments that need to be brought up to FHA requirements. This will include removing an existing 30 inch bathroom door and replacing with a 34 inch unit, replacing the vinyl flooring, finishing the trim work and repainting, installing a new vanity top to allow for an "offset" sink, and general cleanup. The units will be occupied during the work, so attentiveness to detail and an ability to work in an occupied unit is a must. Please reply with references if you are interested. The work needs to be completed over a one-year period, so we have flexibility with regards to the schedule. We could break it into smaller jobs or do it all at once, for example.

Project Details

Budget
$25000 to $50000
Timeline
Less than 2 months
Start Date
1-2 Months
Location
Reidsville, North Carolina 27320
Address
1502 Sherwood Drive Reidsville, NC 27230
Property Owned
Yes
Currently in Renovation
No

Homeowner

T

Tom Hahn

Member since May 11, 2016

Contact Homeowner
Back to all projects