Bathroom RemodelingReady to Hire
Bathroom Remodeling
Posted May 15, 2016
Project Description
Hi! I would like to get an estimate on how much it would cost for you to finish the bathroom remodel I started. I have attached lots of photos. Here’s a list of the things I need completed: - Repair hole in dry wall - Replace door or patch hole - Attach board board to wall - Finalize sink and PVC plumbing installation - Tile and grout shower with tile I have bought using charcoal/black grout - Finalize door frame installation - Install glass shower door (purchased from Amazon: http://amzn.com/B00CLOLJBC) - Install threshold Thank you! Robbie
Project Details
- Budget
- $500 to $1000
- Timeline
- Less than 2 months
- Start Date
- Now
- Location
- Franklin, Tennessee 37064
- Address
- 1000 Shannon Lane
- Property Owned
- Yes
- Currently in Renovation
- No